A website content plan is a table that records, for every page, which content it needs, in what format and length, who delivers it, who approves it and by when. It comes after the wireframes and before the design.
Sounds like admin at first. In fact, this is where it’s decided whether your project finishes on time. A polished design won’t help you much if the launch date is fixed and half the content is still missing. With a content plan, you see that early enough to do something about it.
Key points at a glance
- A content plan lists every piece of website content with its page, format, length, who supplies it, who approves it, the deadline and the status.
- Whatever shapes the layout has to be settled before design: headlines, rough text lengths, the number of services or references, and the type of images.
- You need body copy, final photos and approved testimonials before the page is built. Meta texts and alt texts can wait until shortly before launch.
- Every row gets exactly one name and one deadline. Delivering and approving are two separate steps.
- If a piece of content is missing on the day, its role decides: if it shapes the layout, the design waits. Otherwise the page goes live with a shorter version.
What goes into a website content plan?
A content plan covers every piece of content your website needs for launch: texts, images, references, testimonials, downloads, forms and legal pages. For each item it records which page and section it belongs to, its format and length, whether it already exists, who delivers it, who approves it, the deadline and where things stand.
In our article on the website concept, the content plan is the last of seven building blocks. It builds on the page structure, which sets out which pages exist and what job each one does. And it builds on the wireframes, which show which sections appear on a page and in what order. Why these sketches need real headlines rather than placeholder text is something we explain in Creating a wireframe. The content plan picks up where the wireframe stops: with everything that sits below the headlines.
These columns are enough as a framework:
| Column | What you enter | Example |
|---|---|---|
| Page and section | where the content sits | Payroll service page, “Process” section |
| Content | what exactly is needed | Text: switching process step by step |
| Format and length | type and rough length | four short paragraphs of two to three sentences each |
| Source | existing, revise or new | revise (checklist for new clients) |
| Delivers | exactly one person | firm owner |
| Approves | exactly one person | firm owner |
| Deadline | a date | enter date |
| Status | open, delivered, approved, built in | open |
Many people underestimate the “Source” column. Some of your content already exists, just somewhere else: on the old website, in proposals, in brochures, in emails where you explain your process to a prospect. If you mark every row as existing, to revise or new, you can see at a glance how much work really lies ahead.
Which content do you need before design, and what can wait?
Before design, you need all the content that determines the layout: the headlines, the rough length of each text section, the number of recurring elements such as services, references or team members, and the type of images. Everything else can come later, as long as the plan gives it a name and a deadline.
A section for three references looks different from one for twelve. A teaser of two sentences needs a different grid from a text of four paragraphs. And portrait photos fit poorly into a space designed for wide shots. If content arrives in a different shape than expected, either the design gets reworked or the content gets squeezed into the existing form. Both cost time, and texts trimmed just to fit the box often lose exactly the sentence that would have convinced.
| By when | Which content |
|---|---|
| before design | headlines and key message per page, text length per section, number of services, references and team members, image type (photo, illustration, screenshot) and format, contact form fields |
| before the page is built | final body copy, selected and edited photos, approved testimonials, client logos with permission, downloads such as price lists or checklists |
| before launch | legal notice and privacy policy, meta titles and meta descriptions, alt texts for images, text for the thank-you page after the form |
For the content in the middle row, you often depend on other people. A client has to approve their quote, a photographer needs a booking, a reference client has to agree to you showing their logo. So plan this content in earlier than its row in the table suggests.

How do you build the content plan page by page?
Put the wireframes next to an empty table and work through each page from top to bottom. Every section in the wireframe becomes at least one row in the plan. In it you note the specific content, format and length, whether it already exists, and who is responsible. Pages without their own wireframe you add from the page structure.
Take the example firm from our concept article, which mainly looks after trade businesses. Its payroll service page might consist of seven sections in the wireframe: a headline with the message, the trade business’s situation, the scope of the service, how switching works, a testimonial, answers to common objections and the contact step. For the switching process there may already be a checklist that new clients receive, so that row says “revise”. The testimonial doesn’t exist yet. It gets “new” and an early deadline, because a client has to be asked first, then they write it, then they approve it.
A few details make the plan much more useful:
- Make length tangible: “two to three sentences” or “five questions with short answers” instead of “detailed”. That way the person writing knows how much work is ahead of them.
- Describe images: “photo of the owner in conversation, landscape” instead of “image”. Later, this turns straight into the shot list for the photo shoot.
- List recurring items once: contact details, opening hours and footer texts appear on many pages, but only in one row of the plan.
- Include mandatory pages: legal notice, privacy policy and the thank-you page after the form easily slip through because they don’t appear in any wireframe.

In the end, even a small website often has more rows than you’d have expected. That’s not a bad sign. The work was there before, just invisible.
Who delivers what by when?
Every row in the content plan gets exactly one responsible person and one deadline. You enter delivering and approving separately, because they are often different people and approval takes time of its own. You plan the deadlines backwards from launch: first the date, then the buffers for approval and building in, then the delivery deadlines.
“Team” or “we” in the “Delivers” column means, in practice, nobody. If there’s a name, that person knows they’re meant, and you know whom to ask. The same goes for approval. If the owner writes the text and their partner is supposed to read it too, then the partner is the approver, and that belongs in the plan.
In our projects, testimonials and logos usually come last, and testimonials are the hardest to plan. A logo is sent fairly quickly. A testimonial, on the other hand, takes time and a bit of effort: your client wants to write you something helpful, but it isn’t a priority in their calendar. That’s why we recommend building testimonials firmly into project completion and collecting them at every handover. Then they’re ready when you need them, and you don’t have to remind anyone again and again.
Planning backwards forces you to be honest. Once the launch date is fixed, it follows when everything has to be built in, when it has to be approved and when it has to be delivered. How much buffer you need between these steps depends mainly on how many people are reading along. A text only you approve gets through faster than one that three directors want to comment on.
We usually see two set-ups. In practices, the practice lead often approves things personally. In somewhat larger consultancies, someone from the team often coordinates the project and puts the final content to the management for approval.
The “Status” column keeps everyone on the same page. Four values are enough: open, delivered, approved, built in. A glance at the table then shows where things are stuck, without you having to search through three email threads.

What you should clarify before you first approach a provider is covered in our article on writing a website brief.
What do you do if content is missing on the day?
If content is missing, its role in the layout decides. If it shapes the design, such as a headline or the number of references, the design waits until it’s there. If it only adds to a page, the page goes live with a shorter version and the content follows. Placeholder text on a published page is not a solution.
Shortly before launch, the testimonials still haven’t been approved. The page works without that section, it’s just a little weaker. You take it out for now, leave the row in the content plan on “open” and enter a new deadline. That way the content doesn’t drop out of sight just because the page is already online.
It’s different if the home page message isn’t settled yet. Then the foundation the design builds on is missing, and any design would be guesswork. In that case it’s better to push back the start of design than to rework it later.
In our projects, one question decides: can the page do without this content? If so, it goes live without it, because the benefits of the new website outweigh waiting, and the section is added once the content is there. If it’s essential to the page, the launch moves.
Frequently asked questions about the content plan
Who should create the website content plan?
The first draft comes from whoever knows the wireframes best, so your provider, or you if you’re running the project. You set names and deadlines together. Only you know who in your business has time to write alongside day-to-day work and who wants a say in approvals. A plan the people delivering never agreed to remains a wish list.
Which tool works for a content plan?
A table that everyone involved can access is enough for a content plan. More important than the tool is that there is exactly one current version, not several files in different email threads. Store the content itself in a shared folder and link to it from the relevant row. That way everyone finds the latest version without having to ask.
Do you need a content plan for a small website too?
Yes, especially there. For a website with only a few pages, the plan fits on one screen. In small teams, one person often supplies almost all the content alongside day-to-day work. The plan then shows early whether the deadlines are realistic or whether you should hand off tasks or set the launch later.
What’s the difference between a content plan and an editorial calendar?
A website content plan covers the content that has to be ready for launch and is essentially done once the site goes live. An editorial calendar manages ongoing content such as blog posts, newsletters or social media posts over months. Both use similar columns. Open rows from the content plan, such as references that come later, can move into the editorial calendar after launch.
Conclusion
A content plan turns your wireframes into a list with names and deadlines. What matters is the order: whatever shapes the layout is settled before design, everything else follows with a clear deadline. Start with your home page. Open an empty table, write each section as a row, mark it as existing, to revise or new, and put a name next to it. If you’d like to know first where your current website is losing enquiries, use our free website check.